Sunday, 15 February 2015

Eaves & Electrical Rough in & Insulation

Well last week bricks where cleaned, and I was starting to wonder how long our build was going to take.

On Friday I was told that gyprock would be started this coming week. Lets just say they have done a lot in the past week, and I have been left amazed.

I am also impressed with the way Provincial has approached and are resolving some of the issues that have popped up.


  • The framing issue I mentioned earlier, I could see through a window has now been resolved which is fantastic.
  • The missing articulation joint in the rear will be added in next week as well. 


Lets just say I am pretty impressed with how it's all looking and starting to take shape. The finish level from the outside does look pretty amazing. The bricks look even better now that they have fully dried. I can't wait to see what it will look like when gyprocked.

Since last week it looks like they have finished off the following.


  • Eaves Done
  • Electrical Rough in done
  • Insulation done
  • Gas Meter installed
  • Electrical box installed
I have been told that gyprock will be started this coming week. The house is really starting to take shape.

For those following the one thing I would reconsider is how much sound insulation you get done between walls, if I were to go back I would probably include a few more walls. Then again most people don't really do any !!

Anyways on with the photos.












Sunday, 8 February 2015

Bricks Cleaned

Went by the house the other day, and it looked like I had probably just missed the brick cleaner by a few hours.

The bricks still looked a little damp, but they had been acid washed. The Bowral Murray Grey bricks have come up really nice. 

I haven't been able to have a look at the bricks close up, but I'm hoping that no mortar has been blown out through the washing process.






Kinda Grey and Pink up close, the brown brick will be moroka'd and dune in color.

Looks nice when the sunlight hits it.


Wednesday, 28 January 2015

Roof Tiles are on

Well what can I comment on here ? Not much our gunmetal boral contour roof tiles are on. Looks pretty good I think.







Thursday, 22 January 2015

Framing on the way to resolution :)

My site supervisor got back from his much needed break on Monday, thought I would give him a few days to recover befor hassling him about the frame issue that came up.

I must say a lot of people with other builders complain about there site supervisors, but my guy (yeah let's call him my guy) so far he is fantastic. Great guy to have a chat with and always manages to put your mind at ease at the end of the conversation.

He mentioned he is familiar with the design and is getting the framer back in the next week or so to fix up a few bits and pieces and this would be one of them.

Must say I enjoyed the conversation I had with him, very approachable guy.

Have also heard that roof has almost been finished and electrical rough in should start next week. Happy Days.

On a side note I'm wondering what happens to the excess bricks, do they typically get thrown out ? Or sent back to Austral ? Wondering if I can keep the excess for a few brick pillars I wanted to get done up after handover. Save that for my next chat with my SS.

Wednesday, 14 January 2015

Frame Inspection - Error 404 Part of Frame not Found

For a little bit of piece of mind I had a building inspection done. I used Gordon from Jim's building inspection to come and check out the frame and slab to give me some piece of mind that all was progressing well.

I should mention that Provincial has been good at addressing my concerns and questions so far, and I have been pretty happy. The sewer survey charge on the previous invoice was an error and amended with little effort which was good.

He did find two issues which were raised with the SS, I'll keep tabs on them throughout the build to make sure they don't get forgotten.

Minor things, were found like triple grips missing from the back of the house. Triple grips are what connect the roof trusses to the wall frames.

The other big item was that the frame in the hallway seemed to be floating in air. At the time I couldn't figure out why it was like this, and Owen the site supervisor mentioned he would look at the plans. Well a few weeks later it hit me when I was looking at pictures of the display home and the plans.

The plans state that they are building a half wall, which I thought was as per the display home, but it's not. The display home has three windows there with shutter's in them which we are planning on replicating.

This part of the house is a bit of a focal point and is going to look odd if it is built as is, and not as per the display. I'll be chatting with Owen and Provincial when they are back from the break to make sure it's completed as per what was expected. If it is built as is, the portion hanging in air would be a prime cadidate for plaster cracking and would be able to swing if hit hard enough. I don't know how this stuff up was missed.

This part here is hanging in the air, and I think even the framer probably thought it's unsafe hence the temporary bracing holding it up.



I guess this is where it would have helped if we had sat down and walked through the plans like we did with the first design. For anyone following and planning to build, make sure you sit down with your sales rep and walk through each and every room so you understand the design intricacies.

This is the design we currently have




And this is how it should look. Yeap I consider myself an expert in photoshop ;)


I'll be pretty annoyed if it's not fixed up as per the display, personally I don't think it's a huge fix at this stage.

I have sent a txt message to the site supervisor on the add chance he is working, but haven't received a response. I'll touch base when they officially open on the 19th of Jan.

Will update when the crew is back at work, and hopefully with a drama free outcome.

Stay tuned

Sunday, 11 January 2015

Guttering & Facia Installed

Took a drive by the block to see if any work had been done and found that guttering and facia has been installed.

Still missing a length around the back, but it's nice to see they have started the roof.





Thursday, 8 January 2015

Bricking Almost Completed

Well I didn't really get a chance to update this blog over the break, but I went and had a look at the house and found that bricking looks like it's almost complete.

Roof tiles had also been delivered on site, which suggest roofing will begin soon too.

I'll let the pictures do the talking, as mentioned previously the articulation joints aren't as per the plans so i'll be checking with Provincial to see what they have to say.

It looks like the brick work is ok, but i'll reserve comment till it is 100% complete

Pictures





My wife managed to get this picture when the brickies were on site with there permission, I'm a bit concerned about the mortar coverage from the inside of the bricks, but have been told by a friend whom is a builder, that typically the brickies come back and fill things in from the inside. Shall see what happens.